TAIZHOU Power Plant has 2×1000MW ultra-super-critical units. The plasma ignition system was installed and helped to save plenty of fuel oil during boiler startup and combustion stabilization.
Name of Power Plant | TAIZHOU Power Plant |
Number & Capacity of Unit | 2×1000MW |
Type of Project | Retrofit |
Boiler Supplier | Shanghai Electric |
Type of Boiler | Ultra-super-critical once-through boiler, single furnace, one reheat, outdoor arrangement, balance draught, dry bottom |
Type of Combustion | Wall-fired, total 24 sets of coal burners arranged in 6 layers |
Number of Plasma Burners | 8 (per boiler) |
Location of Plasma Burners | Bottom two elevation |
Fuel Oil System | Retained for standby ignition method |
Pulverizing System | Direct fired pulverizing system with 6 sets of bowl mills |
Coal Quality | Bituminous with high moisture |
Rate of Fuel Oil Saving | 100% |
Post time: May-10-2023