head banner

EREN Power Plant in Turkey(Plasma Ignition and Combustion Stabilization Project)

EREN Power Plant is owned by EREN HOLDING Group Co., Ltd. It has 2×600MW supercritical units. Two units were put into commercial operation in 2010 and 2011, respectively. The plasma ignition system was installed on the two units in 2013 and 2014 and helped to save plenty of fuel oil during boiler startup and combustion.

Name of Power Plant EREN Power Plant
Number & Capacity of Unit 2×600MW
Type of Project Retrofit
Boiler Supplier Dongfang Boiler Company(DEC)
Type of Boiler Supercritical, once-through boiler, single furnace, one reheat, outdoor arrangement, balance draught, dry bottom
Type of Combustion Wall fired, total 24 swirl burners with 12 in 3 layers of front wall and 12 in 3 layers of rear wall
Number of Plasma Burners 4 (per boiler)
Location of Plasma Burners at bottom elevation of front wall
Fuel Oil System Retained for standby ignition method
Pulverizing System Direct fired positive pressure with 6 sets of bowl mills
Coal Quality Bituminous
Rate of Fuel Oil Saving 100%
Plasma Ignition and Combustion Stabilization Project of EREN Power Plant in Turkey

Post time: May-10-2023