KARABIGA Power Plant is owned by CENAL Group Co., Ltd. It has 2×660MW ultra-supercritical units. The plasma ignition system was installed during its construction stage, and helped to save plenty of fuel oil during boiler commissioning as well as commercial operation.
| Name of Power Plant | KARABIGA Power Plant |
| Number & Capacity of Unit | 2×660MW |
| Type of Project | Newly-built |
| Boiler Supplier | Wuhan Boiler Works, Alstom |
| Type of Boiler | Supercritical, once-through boiler, single furnace, one reheat, outdoor arrangement, balance draught, dry bottom |
| Type of Combustion | T-fired, total 24 sets of coal burners arranged in 6 layers |
| Number of Plasma Burners | 8 (per boiler) |
| Location of Plasma Burners | at bottom two elevation |
| Fuel Oil System | Retained for standby ignition method |
| Pulverizing System | Direct fired positive pressure with 6 sets of bowl mills |
| Coal Quality | Bituminous |
| Rate of Fuel Oil Saving | 100% |
Post time: May-10-2023