p0007138@ceic.com
Mon - Fri 8:00AM-17:00PM
English
中文
Home
About Us
Technology
Oil Saving Ignition Technology
Boiler Combustion Technology
Intelligent Control Technology
Idler Roller
Catalysts
Projects
Services
News
Contact Us
Cooperative Partner
MOIS Project
Qinbei Power Plant, China(Mini Oil Ignition and Combustion Stabilization Project)
Unit 3 and Unit 4 were put into commercial operation in Nov. And Dec. 2007 respectively after 168 hours full load operation. The oil consumption for each unit was no more than 200 tons by using MOIS and created a new record of low oil consumption during the commissioning...
Read more
Changshu Power Plant, China(Mini Oil Ignition and Combustion Stabilization Project)
After the application of mini oil ignition system, the oil consumption of one unit under cold startup is less than 10 tons, the saving rate of oil is above 90%. Boiler model HG1952/25.4-YM, supercritical, with front and rear walls opposed swirl burners Number & ...
Read more
Beijiang Power Plant, China(Mini Oil Ignition and Combustion Stabilization Project)
During the steam blowing stage of unit 1, there were over 200 times of blowing operations while around 91 tons of fuel oil as well as 3752 tons of coal were used by MOIS. It is estimated conservatively that around 1000 tons of fuel oil had been saved by using MOIS compar...
Read more
Hit enter to search or ESC to close
English
French
German
Portuguese
Spanish
Russian
Japanese
Turkish
Italian
Indonesian
Hindi
Lao
Filipino
Burmese
Thai
Vietnamese