浏览器版本过低,是时候升级您的浏览器了

您正在使用 Internet Explorer 的过期版本(IE6、IE7、IE8 内核的浏览器)。这意味着在升级浏览器前,您将无法继续访问。


为什么会出现这个页面?

如果您不知道升级浏览器是什么意思,请请教一些熟练电脑操作的朋友。如果您使用的不是IE6/7/8,而是360、QQ、搜狗等,双核浏览器,出现这个页面可能是您切换到了兼容模式,请切换到极速模式下,如果还不行请升级至最新版浏览器。


请注意:微软(Microsoft)对 Windows XP 及 IE6、IE7、IE8 的支持已经结束

自 2014 年 4 月 8 日起,微软(Microsoft)不再为 Windows XP 和 Internet Explorer 8 及以下版本提供相应支持和更新。如果您继续使用这些,您将可能受到病毒、间谍软件和其他恶意软件的攻击,无法确保个人信息的安全。请参阅 Microsoft 关于 Windows XP 支持已经结束的说明

您可以选择更先进的浏览器

点击此处前往下载

  1. English
  2. 中文
  3. Pусский

The Diagnostic Test of the National Project Ultra-low NOx Pulverized Coal Combustion Technology before the Retrofit Participated by LY Power Successfully Completed

The Diagnostic Test of the National Project Ultra-low NOx Pulverized Coal Combustion Technology before the Retrofit Participated by LY Power Successfully Completed

The Diagnostic Test of the National Project Ultra-low NOx Pulverized Coal Combustion Technology before the Retrofit Participated by LY Power Successfully Completed

July 22,2019

Recently, the diagnostic test of the national project, Ultra-low Nox Pulverized Coal Combustion Technology Project, on the 330MW unit in Inner Mongolia Dongsheng Thermal Power Co., LTD (hereinafter referred to as Guodian Dongsheng) in which LY Power participated was successfully completed.  

Ultra-low NOx Pulverized Coal combustion Technology was a key national research and development plan set up in 2018. By applying coal pretreatment technology and in-furnace combustion adjustment this technology can lower the boiler NOx emission to 50-100mg/m3, and improve its technical index to international leading level. The project was approved by the Ministry of Science and Technology of China in May 2018, and LY Power was entrusted to undertake one theme and three sub-themes. This diagnostic test was an important node in the research and development of the project in 2019. The present NOx emission level of boiler No. 2 in Guodian Dongsheng and other main operating parameters of the boiler before the retrofit will be an important basis for the formulation of the ultra-low NOx emission retrofit technology for 300MW and above boilers.

The test was led and organized by the Plasma Technology Research and Development Department of the company. With support from the Boiler Clean Combustion Division of LY Power and the assistance from Guodian Dongsheng, the test was successfully completed with the participation of the scientific research personnel of each subject undertaking and participating units. Through this test, the company not only found out the key parameters and operation situation of the 330MW unit of Guodian Dongsheng before retrofit, but also laid a solid foundation for the smooth completion of the mid-term index of the project, which would effectively promote the development process of the project.